Pre-start checks – Grain Systems Unload Augers PNEG-1521 User Manual

Page 37

Advertising
background image

OPERATION

37

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

15. PRE-START CHECKS

A. Make sure that ALL belt(s) are tensioned properly.

B. Make sure that ALL shield(s) are in place, and that the belt(s) and pulley(s) are able to move freely.

C. Inspect the drive unit for any problems, or potential problems.

D. Be aware of ALL emergency shutdown procedures. Two (2) people must always be in a position

where the operation of the equipment can be monitored.

E. Before starting the auger for the first time, make sure that all parts are assembled correctly

according to the instructions in this manual.

Failure to perform any and all of these pre-start checks may cause

damage to the equipment and could cause SERIOUS INJUR Y or DEATH

to those in the work area. A failure to perform any and all of these pre-

start checks may also be a misuse of the equipment, which may void the

warranty.

ALWAYS keep ALL guard(s) and shield(s) in place until all the power is

disconnected and locked out.

Make certain that ONLY trained operators are in the work area

before operating or moving the equipment. T wo (2) people must

always be in a position where the operation of the equipment can be

monitored.

Advertising