Grain Systems Unload Augers PNEG-1521 User Manual

Page 26

Advertising
background image

INSTALLATION

26

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

10. ASSEMBLING AND INSTALLING THE UNLOAD FLIGHT

(Cont.)

E. Insert the Unload Flight into the Unload Tube with

the Square bushing end facing the Centerwell,
and the Round bushing end facing the Discharge
End of the Tube.

Centerwell Square Shaft

Unload

Flight

FIG. 10-C

FIG. 10-B

F. When the Unload Flight is approaching the

Centerwell Square Shaft, it will be necessary to
rotate the Flight counter-clockwise to get it to seat
properly on the Square Shaft. When the Flight is
properly seated, the Flight should be entirely
inside the Unload Tube. It may be necessary to
pull the Flight out a small amount and attempt this
step multiple times in order to seat the Flight
properly.

G. On an initial install with an empty bin, the installer

should open the Centerwell Gate and enter the bin
to check and see that the Flight is seated. Once
they have seen that it has seated, they will know
the proper position the Flight is in on the
Discharge End, when seated properly.

Advertising