INSTALLATION

16

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

4. UNLOAD TUBE ASSEMBLY INSTALLATION

(Cont.)

5/16” Serrated

Flange Nuts

Connecting Band

5/16” x 1 -1/2”

Hex Bolts

E. Position the Unload Tube flush against the

Centerwell tube.

Unload Tube

Centerwell Tube

F. Slide the Connecting Band until it is equally

positioned over both the Unload Tube and the
Centerwell tube. Position the Connecting Band so
that it will not interfere with the control rods.

G. Secure the Connecting Band with three

(3) 5/16" x 1-½” Hex bolts and Serrated Flange
nuts, making sure the Intermediate Wells are
level with the Centerwell.

FIG. 4-C

FIG. 4-D