INSTALLATION

15

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

A. Cut an opening in the bin wall for the unloading

tube to pass through. The hole should be
approximately 13 ½” in diameter, 6” below the
level of the floor and inline with the Centerwell
tube.

y

B. From inside the bin, insert the angle ring end of

the Unload Tube Assembly through the hole in the
bin sidewall.

C. On bins > 60’ in diameter, place the angle ring end

of the outer Unload Tube Assembly through the
hole in the bin sidewall, and then place the inner
Unload Tube Assembly into place.

D. Place the 12” Connecting Band onto the end of

the Unload Tube Assembly closest to the
Centerwell.

4. UNLOAD TUBE ASSEMBLY INSTALLATION

Centerwell

Connecting Band

Before installing the Unload

Tube Assembly, remove the

Unload Flight from inside of the

tube. On 36’ and 42’ diameter

bins, the Clutch Control Rod is

shipped inside the Unload Flight.

Unload Tube

FIG. 4-A

FIG. 4-B

13. 500

6. 000