INSTALLATION

23

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

A. Install the longest section of the ½” Clutch Control

Rod to the Clutch Control Arm on the Centerwell.
Make sure that it is contained in the square Clutch
Control Pipe Guides on the Intermediate Wells.
Bolt the Rod to the Arm with a 5/16" x 1-¾” Hex
bolt and Nylock nut.

9. CLUTCH CONTROL INSTALLATION

B. Connect the two Clutch Control Rods by threading

the ½” Internal Pipe Connector halfway onto the
Rod attached to the Centerwell. Bring the other
Clutch Control Rod up to it by running the Rod
through the Clutch Control Pipe Position Lock in
the Bin Flange, threaded end first, and making
sure that the Rod is contained by the Guides on
the Intermediate Wells. Then thread the Rod onto
the remaining threads on the Coupler.

On 36’ and 42’ diameter bins, the Clutch Control Rod will come preassembled,

and shipped inside the Unload Flight.

Centerwell

5/16” x 1-3/4”

Hex Bolt

5/16” Nylock Nut

Clutch Control Rod

CENTER OF BIN

1/2” Internal Control Pipe Coupler

Clutch

Control Arm

FIG. 9-A

FIG. 9-B

FIG. 9-C