INSTALLATION

17

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

5. OUTER UNLOAD TUBE ASSEMBLY INSTALLATION

A. On bins > 60’ in diameter, loosen or unbolt the 30”

Connecting Band from the outer Unload Tube
Assembly.

B. Position the outer Unload Tube Assembly flush

against the inner Unload Tube Assembly, aligning
the two keyways so that they are inline, and
making sure all of the Intermediate Wells are level
with the Centerwell.

C. Slide the Connecting Band until it is equally

positioned over both the Unload Tube Assemblies.
Position the Connecting Band so that it is aligned
with the keyways on the Unload Tubes.

D. Secure the Connecting Band with eight

(8) 3/8" x 1-½” Hex bolts and Stover nuts.

Inner Unload Tube

Outer Unload Tube

Connecting Band Bolts

and Nuts Removed

CENTER OF BIN

Inner Unload Tube

Outer Unload Tube

Keys are Aligned

Connecting Band

Connecting Band Centered and

Aligned Over Keys

3/8” x 1-1/2” Hex Bolts

CENTER OF BIN

CENTER OF BIN

FIG. 5-A

FIG. 5-B

FIG. 5-C

3/8” Stover Nuts