INSTALLATION

31

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

N. Attach the second and third sections of Back

Shield to the Bearing Stand Assembly together
with the Carrier Wheel Assembly. Use two (2)
3/8" x 3-½” Hex bolts, four (4) flat washers, and
two (2) Nylock nuts.

11. INSTALLING THE SWEEP FLIGHTING

(Cont.)

O. Bolt the Shield Splice Plate to complete the

connection of the two Back Shields. Use four (4)
5/16" x ¾” Hex bolts, flat washers, and Serrated
Flange nuts.

P. The Carrier Wheel Assembly height can be

adjusted by using the 3/8" x 1" bolts on the Sweep
Carrier Body.

Q. Repeat Steps L & M until all Shield sections are

assembled.

Carrier Wheel

Assembly

3/8” x 1” Height
Adjustment Bolt

Second

Back Shield

Assembly

3/8” x 3-1/2”

Hex Bolt

Flat Washer

Bearing

Stand Assembly

Third

Back Shield

Assembly

5/16” x 3/4”

Hex Bolt

Flat Washer

Shield

Splice

Plate

5/16” Serrated Flange Nut

Flat

Washer

3/8” Nylock

Nut

FIG.11-L

FIG.11-M

Sweep Arms with three (3) or

more Flight and Shield sections,

a Carrier Wheel Assembly is

used. The Carrier Arm should

be installed after the first two

(2) sections of Flight and Shield.