INSTALLATION

29

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

F. Align the next section of Sweep Flight making sure

that the Dura-Edge on both Flights are as
continuous as possible, the angle between both
faces being greater than 90°, and less than 180°,
and without overlapping.

11. INSTALLING THE SWEEP FLIGHTING

(Cont.)

J.

Attach the Shield Pivot Bracket to the Gearbox
Pivot Bracket using a 1/2" x 1/2" Shoulder bolt
and Nylock nut.

G. Install the next section of Sweep Flight. Bolt it to

the Connecting Shaft using two (2) 5/8" x 4" Grade
8 bolts and Stover nuts.

H. Repeat Steps D - G for additional sections of

Sweep Flight.

I.

Attach the Gearbox Pivot Bracket onto the
Gearbox with four (4) ½” x 1-¼” Flange bolts and
flat washers.

Overlapping the Flights, or
having an angle between the
ribbon faces be less than 90° or
greater than 180°, will result in
reduced unload capacity.

5/8” x 4” Hex Bolt

5/8” Stover Nut

Gearbox Pivot

Bracket

Flat Washers

1/2” x 1-1/4”

Flange Bolts

FIG. 11-F

FIG. 11-G

FIG. 11-H

1/2" Nylon Lock Nut

1/2" x 1/2" Shoulder Bolt

Shield Pivot Bracket