Outer unload tube assembly installation (cont.) – Grain Systems Unload Augers PNEG-1521 User Manual

Page 18

Advertising
background image

INSTALLATION

18

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

E. Thread the 1” External Control Pipe Coupler onto

the Intermediate Control Rod. Also thread the ½”
Internal Control Pipe Coupler onto the Centerwell
Control Rod.

5. OUTER UNLOAD TUBE ASSEMBLY INSTALLATION

(Cont.)

CENTER OF BIN

Inside Intermediate

Control Rod

1” External Control

Pipe Coupler

1/2” Internal Control

Pipe Coupler

Centerwell

Control Rod

Centerwell Control Rods

Inside Intermediate

Control Rods

FIG. 5-D

CENTER OF BIN

FIG. 5-E

F. Thread the other Centerwell Rod onto the ½”

coupler and leave it slightly loose. Also thread the
other Intermediate Rod onto the 1” coupler.

Advertising