Installing the sweep flighting – Grain Systems Unload Augers PNEG-1521 User Manual

Page 27

Advertising
background image

INSTALLATION

27

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

A. Attach the U-Joint to the Centerwell Gearbox Shaft

using a ¼” x 1-¼” Square Key, and a 3/8" x 3" Hex
bolt and Stover nut.

11. INSTALLING THE SWEEP FLIGHTING

Use the table below to

determine the length, quantity

and position of the sweep

flights and back shields from

the center well to the wall, for

the given bin diameter .

B. Attach the U-Joint Flight Shaft to the U-Joint using

a 3/8" x 1-½” Square Key, and a ½” x 3-¼” Hex
bolt and Stover nut. Tighten both setscrews after
installation of keys.

Centerwell

Gearbox Shaft

1/4” x 1-1/4” Key

U-Joint

3/8” Stover

Nut

U-Joint

1/2” x 3-1/4”

Hex Bolt

U-Joint

Flight Shaft

3/8” x 1-1/2” Key

1/2” Stover Nut

FIG. 11-A

FIG. 11-B

3/8” x 3” Hex Bolt

Bin Diameter

Length

Position from Center

6'-10"

1

8'-4"

2

9'-10-1/4"

1

8'-4"

2

6'-10"

1

8'-10-1/2"

2

5'-4"

3

9'-4"

1

9'-4"

2

5'-4"

3

8'-4"

1

9'-4"

2

9'-4"

3

8'-4"

1

8'-4"

2

6'-10"

3

9'-4"

4

8'-4"

1

8'-4"

2

8'-4"

3

9'-4"

4

8'-4"

1

9'-4"

2

8'-4"

3

9'-10-1/4"

4

Sweep Flights and Back Shields

36

42

48

78

52

60

72

75

Advertising