INSTALLATION

22

PNEG-1521 Commercial Direct Gear Drive Bin Sweep Auger

E. With the Rack & Pinion fully extended towards

the bin wall, attach the Half Band with six
(6) 5/16" x 1-½” Hex bolts, flat washers, and
Serrated Flange nuts.

F. Slide the ¾” Wrenches over the shafts on the

Rack & Pinion, making sure the collar faces the
gears. Fasten the Wrenches with the two
(2) 3/8" x ¾” Flange bolts and flat washers.

8. RACK & PINION INSTALLATION

(Cont.)

On 36’ diameter bins, install the Rack & Pinion using the steps above, noting

that there is no Outside Intermediate Control Rod to attach to, and only one

Rack to operate the Center and Intermediate Wells.

FIG. 8-D

FIG. 8-E