Attaching the a-frame to the eave bracket, Chapter 7: roof assembly – Grain Systems Tanks PNEG-4060 User Manual

Page 106

Advertising
background image

Chapter 7: Roof Assembly

Figure 7-23 Exploded view of A-frame to center collar

A

A-frame rafter assembly

C

7/16 x 1-1/4 in. flange bolt (S-10250)

B

Center collar (CTR-0147)

D

7/16 in. flange nut (S-10251)

Attaching the A-Frame to the Eave Bracket

Assemble the lower portion of the A-frame rafters to the sidewalls.

1. Lower the A-frame rafter assembly (A) along the side of the eave bracket (C), and align with the

proper holes.

NOTE: Use the alignment hole (E) in the rafter to help align the holes with a punch tool.

2. Install flange bolts (B) and flange nuts (D), securing one side on the A-frame assembly.

3. Repeat this procedure for the other side of the A-frame.

4. Tighten to the recommended torque specifications. See

Bolt Torque Specifications, page 29

.

106

Pneg-4060 60 Ft Diameter 40-Series Bin

Advertising