Preparation for roof exhauster installation, Chapter 8: accessories – Grain Systems Tanks PNEG-4060 User Manual

Page 130

Advertising
background image

Chapter 8: Accessories

Table 8-2 Peak-to-Exhauster Ladder Rung Kit

Bin Diameter

Location

54 ft

60 ft

Bin Peak

16

LS-260-2

15

LS-260-4

Bolt Hole Count Located on the
Roof Rib

14

LS-260-3

LS-260-5

13

LS-260-4

LS-260-6

12

LS-260-5

11

LS-260-6

Bin Eave

10

9

NOTE: The table above shows the correct ladder step and part number to be installed in the corresponding

hole in the roof rib. Shaded areas show the correct roof exhauster ladder step and part number
with the corresponding hole in the roof rib.

Preparation for Roof Exhauster Installation

Before installing the roof exhauster, some preparation is required, utilizing the roof exhauster mounting
plate and the roof panels that span the roof exhauster mounting plate.

Before You Begin

Determine the location of the roof exhauster and set aside the roof panels that the roof exhauster mounting
plate will span.

What You Should Know

This procedure is to cut the exhauster airflow hole. Use the roof exhauster mounting plate as a template to
determine the correct location for field drilling and cutting the roof exhauster hole.

1. Position the roof panels (K) spanned by the roof exhauster mounting plate on the ground. Align the

roof panel holes as if they are installed on the bin.

2. Temporarily install the roof exhauster mounting plate (F) to the roof panels (K) using bolts (G) and

nuts (E), ensuring all holes are aligned and the teeth of the roof exhauster mounting plate (F) are nes-
tled in between two roof ribs. Also field drill all required holes (H) on the roof panels (K).

3. Using the roof exhauster mounting plate (F), mark or scribe the hole (I) to be cut.

Tip

If tabs are already bent, flip the mounting plate upside down to scribe the hole location.

130

Pneg-4060 60 Ft Diameter 40-Series Bin

Advertising