Assembling purlin number 1 – Grain Systems Tanks PNEG-4060 User Manual

Page 98

Advertising
background image

Chapter 7: Roof Assembly

Assembling Purlin Number 1

Purlin number 1 is located closest to the eave.

Before You Begin

Place two roof rafters on the ground with roof panel holes facing up. Several A-frame assemblies will have
X-bracing installed and be placed periodically throughout the perimeter of the roof. Determine if X-bracing
is being installed and note those steps in this procedure.

What You Should Know

The A-frame assembly consists of two roof rafters identified as the left-hand roof rafter (A) and the right-
hand roof rafter (C). The purlin configuration may not be the same on all A-frames at this location (number
1), depending if X-bracing is being installed or not.

There are also two different purlin clips, a left purlin clip (E) and a right purlin clip (D). The left purlin clip
has seven holes, compared to the right, which has six holes along the purlin and purlin clip mating surface.

IMPORTANT: Do not drill additional holes in purlin. Install the flange bolts and nuts as dictated by the

number of holes in the purlin.

NOTE: The seventh hole located in the center of the left purlin clip (E) is for identification purposes only.

No hardware is used in this location.

1. Attach a right purlin clip (D) and a left purlin clip (E) to the right-hand roof rafter (C), and install two

flange bolts (F) and two flange nuts (I) into the two top holes.

NOTE: If no X-bracing is being installed, install three flange bolts (F) and three flange nuts (I) in this

step.

2. Attach a right purlin clip (D) and a left purlin clip (E) to the left-hand roof rafter (A), and install two

flange bolts (F) and two flange nuts (I) into the two bottom holes.

NOTE: If no X-bracing is being installed, install three flange bolts (F) and three flange nuts (I) in this

step.

3. Install the purlin (H) to the right purlin clip (D) and the left purlin clip (E) located between each roof

rafter. Install eight flange bolts (B) and eight flange nuts (G) securing the purlin to the purlin clips.

NOTE: If no X-bracing is being installed, proceed to step 8.

4. Attach the bottom X-brace (K) to the right-hand roof rafter (C), and install a flange bolt (F) and a

flange nut (I) into the bottom hole.

IMPORTANT: For adjustment purposes, DO NOT tighten the X-brace flange bolts until all X-braces

have been installed.

5. Attach the top X-brace (J) to the left-hand roof rafter (A), and install a flange bolt (F) and a flange nut

(I) into the top hole.

6. Secure the bottom portion of each X-brace (J and K) with a flange bolt (F) and a flange nut (I).

7. Install a flange bolt (L) and a flange nut (M), securing the X-braces (J and K) together.

8. After all purlins are installed, tighten all hardware to the recommended torque specifications. See

Bolt

Torque Specifications, page 29

.

98

Pneg-4060 60 Ft Diameter 40-Series Bin

Advertising