Chapter 7: Roof Assembly

Figure 7-9 Installing a temperature cable bracket

A

Roof rafter

D

Left purlin clip (CTR-0489)

B

8 in. temperature cable bracket (CTR-0172)

E

7/16 x 1-1/4 in. flange bolt (S-10250)

C

Right purlin clip (CTR-0490)

F

7/16 in. flange nut (S-10251)

3. Install a quick link (C) to each cable bracket (B) to support the temperature cables.

IMPORTANT: Do not attach weights to the temperature cables; secure the bottom of cables to the

floor with light twine. No roof rafter shall support more than one cable.

88