6920dw sonde bulkhead, Lubricate o-rings – YSI 600DW-B Sonde User Manual

Page 19

Advertising
background image

Sondes

Section

2


6920DW SONDE BULKHEAD


‰

6572 Free chlorine probe = 3-pin connector

3

5

4

FREE

CHLORIN

E

EE

COND/TEMP

ISE1/ISE2

pH/ORP

ISE3

ISE4

ISE5

MOUNTING SCREW

1 OF 2

TURBIDITY
CHLOROPHYLL
RHODAMINE WT

‰

6560 Conductivity/Temperature = 6-pin connector

‰

6561 pH = 4-pin connector

‰

6565 Combo pH/ORP = 4-pin connector

‰

6566 Fouling Resistant pH//ORP = 4 pin connector

‰

6561FG pH (Flat Glass) = 4-pin connector

‰

6565FG pH/ORP (Flat Glass) = 4-pin connector

‰

6882 Chloride Probe = leaf spring connector

‰

6883 Ammonium Probe = leaf spring connector

‰

6884 Nitrate Probe = leaf spring connector

‰

6026 Turbidity Probe, Wiping = 8 pin connector

‰

6136 Turbidity Probe, Wiping = 8 pin connector

‰

6025 Chlorophyll Probe, Wiping = 8 pin connector

‰

6130 Rhodamine WT Probe, Wiping = 8 pin connector


LUBRICATE O-RINGS

Apply a thin coat of O-ring lubricant, supplied in the YSI 6570 Maintenance Kit, to the O-rings on the
connector side of each probe that is to be installed.

LUBRICATE O-RINGS

CAUTION: Make sure that there are NO contaminants
between the O-ring and the probe. Contaminants that are present
under the O-ring may cause the O-ring to leak
when the sonde is deployed.






NOTE: Before installing any probe into the sonde bulkhead, be sure that the probe port is free of
moisture. If there is moisture present, you may use compressed air to blow out the remaining moisture.




INSTALLING THE TURBIDITY, CHLOROPHYLL, AND RHODAMINE WT PROBES

If you have a turbidity, chlorophyll, and/or rhodamine WT probe, it is recommended that the optical
sensors be installed first. If you are not installing one of these probes, do not remove the port plug, and go
on to the next probe installation.

YSI Incorporated

Drinking Water Monitoring Systems Operations Manual

2-12

Advertising
This manual is related to the following products: