2 step 2 - installing the probes, Removing the port plugs – YSI 600DW-B Sonde User Manual

Page 17

Advertising
background image

Sondes

Section

2





















NOTE CAREFULLY: Users who are accustomed to installing a Teflon membrane on a YSI dissolved
oxygen sensor should note that the methods recommended for the Teflon installation are not likely to work
well for the free chlorine membrane because this membrane cannot be stretched. Therefore, dissolved
oxygen membrane installation techniques which are outline in the manuals for various YSI instruments,
including standard 6-series sondes utilizing the 6562 Rapid Pulse DO sensor, are NOT RECOMMENDED
for the free chlorine membrane installation.

2.3.2 STEP 2 - INSTALLING THE PROBES


Remove the calibration cup from your sonde by hand as shown below to expose the bulkhead.


TRANSPORT CUP

BULKHEAD WITH
PROBE PORT PLUGS


REMOVING THE PORT PLUGS

Using the long extended end of the probe installation tool supplied in the YSI 6570
Maintenance Kit, remove the port plugs. Save all the port plugs

for possible future use.

YSI Incorporated

Drinking Water Monitoring Systems Operations Manual

2-10

Advertising
This manual is related to the following products: