0 installation, Enclosure front – Alpha Technologies AlphaGen PN-6x-T 7.5kW 48VDC - Installation and Operation Manual User Manual

Page 26

Advertising
background image

26

745-020-B0-003, Rev. C

3.0 Installation

Prior to installation verify the following:

All necessary grounding rods and materials are in place.

Utility power was run to site in accordance with the NESC (National Electric Safety Code).

Obtained local safety practices for working with high-voltage systems.

Gas piping, hardware, supports, and other gas carrying components to the pad location conform
to NFPA standard and local requirements.

Required Tools and Materials:

Crane to lift enclosure from shipping pallet and place on pad

Key(s) to enclosure doors

• Digital

voltmeter

Torque wrench with insulated handle and 7/16" socket

7/16” box-end wrench

NO-OX or other suitable corrosion inhibiting agent (NCP-2)

Silicone sealant GE RTV123 (or equivalent)

Phillips screwdriver (for pad shear mounting)

5/8" socket for removing pallet mounting bolts

• Hard

hats

• Utility

knife

MOUNTING STUD POSITION

O

0.625 x 1.000 4 PL

ENCLOSURE
FRONT

26.00

O

0.875

GROUND SWEEP

O

3.000

DC SWEEP

O

1.375

AC SWEEP

0.25

3.00

5.35

5.60

7.60

0.581

3.40

Fig. 3-1, Sweep Dimensions (in inches)

Advertising