745-020-B0-003, Rev. C

73

7. Press and hold the ECM’s RAS switch in the STOP position until the generator stops.

8. Disconnect the DWYER # 1212 manometer gas pressure test kit from the secondary

demand regulator.

9. Reapply a small amount of an approved pipe sealant to the Allen-head cap screw,

replace and tighten into the demand regulator.

10. Replace the Maxtrol regulator access cap and gasket, and tighten.

7.0 Maintenance,

continued

7.9

Maxitrol Pre-regulator Calibration, continued

6. Verify the DWYER # 1212 manometer reads 5-1/2" above the “0” mark, and 5-1/2" below

the “0” mark. This equals 11" water column of pressure. Adjust the Maxitrol regulator in a

clockwise direction to increase pressure, and in a counterclockwise direction to decrease

pressure.

Do not bottom out the regulator adjust screw. If you cannot get a reading, retest the inlet pressure to the

Maxitrol gas package.

CAUTION!