Alpha Technologies AlphaGen PN-6x-T 7.5kW 48VDC - Installation and Operation Manual User Manual

Page 72

Advertising
background image

72

745-020-B0-003, Rev. C

Calibration Procedure:

1. Set the ECM Run/Auto/Stop (RAS) switch to the STOP position.

2. Remove the Allen-head screw located on the secondary or demand regulator.

3. Open both ports on the DWYER # 1212 manometer.

4. Set the scale of “0” between the water lines. Connect the pressure test hose (see

above).

5. Remove the Maxitrol regulator adjustment cover (located in the gas service box outside

of the enclosure).

6. Apply 0.5 psi to 2.0 psi gas pressure to the gas package.

7. Place the ECM’s RAS switch in the RUN position. The starter will then crank the engine

until the generator starts (this may take a few seconds to draw excess air from hoses).
When the ECM RAS switch is placed in the RUN position, the ECM will start the engine.

7.0 Maintenance,

continued

7.9

Maxitrol Pre-regulator Calibration, continued

• No matches or open fl ame or sparks. Use caution whenever working in the area to

prevent possible combustion of fuel vapors.

• Leak Hazard: Use caution whenever working in the area to prevent and correct any

leaks detected.

WARNING!

Fig. 7-14, Manometer Connection

Reverse view of demand

regulator showing port

Connect hose and fi tting to

the demand regulator

5 ½"

5 ½"

KEEP

PORT

OPEN

11"

WATER

COLUMN

TOTAL

DWYER

1212

MANOMETER

Advertising