Ransburg, Reinstalling atomizer body onto atomizer extension, Rma-303 indirect charge - maintenance – Ransburg RMA Indirect A11600 User Manual

Page 64

Advertising
background image

>

It is important that the following proce-

dure be adhered to in order that all tubing

and fitting connections can be reached.

NOTE

Tubing Removal (Atomizer End)

(Reference Figure 38)

Using the tubing removal tool (A11373-00) select

the appropriate size end for the tube you want to

remove, 8mm or 6mm. The 8mm end will also

fit over the 10mm green turbine air tube. Place

the opening around the tube and press down on

the quick release collet. Using your other hand,

pull the tubing from the collet. Remove all tubing

from the collets and also remove the fluid tubes

held on with compression nuts. Remove the four

(4) mounting screws (M8 SHCS) that hold the

atomizer body to the atomizer extension using a

6mm hex key.

Reinstalling Atomizer Body Onto

Atomizer Extension

Install the fiber optic cable to the rear plate by

going through the hole in the solvent/cup wash

manifold.

>

Make sure fiber optic cable is flush

with face of rear plate assembly.

NOTE

Figure 40: Installing Atomizer Body Assembly

Onto Atomizer Extension

Before installing the atomizer body, the fiber optic

sensor and cable must be installed as well as

the small solvent line for the cup wash. Slide the

cable and solvent line into the atomizer extension

as you are guiding the atomizer body toward the

extension. Rotate the atomizer body and align the

"black" locating pin with the hole in the atomizer

extension (see Figure 40). The atomizer body

will pilot into a hole of the extension. When parts

are flush, thread the M8 SHCS into the atomizer

body from inside the atomizer extension. Tighten

to 25-30 lbs•in (2.82-3.39 Nm). Install the paint and

dump lines first. Make sure that the tubing is fully

into the fitting before tightening the compression

nuts using a 14mm wrench for the paint fitting nut

and an 11/16" wrench for the dump fitting nut. It

may be necessary to use a wrench on the fitting.

Use a 13mm wrench for the 6mm paint fitting and

a 16mm wrench for the dump fitting.

Starting with the tubing at the center most of the

atomizer body, insert the tubing into the quick

disconnect collets. Make sure tubing is fully in-

serted. (Reference Figures 41 and 42 for proper

tubing locations.)

Align the flat on the fiber optic cable with the set

screw and tighten to 10 lbs•in (1.13 Nm) torque.

Next connect the solvent line from the atomizer

body to the solvent/cup wash manifold. Tighten

carefully in place.

Slide mounting ring over atomizer extension,

threaded end facing towards the rear.

Reinstall break-away ring by aligning the four (4)

holes with the dowel pins on the recessed face of

the rear manifold. Reinstall the six (6) stainless

steel screws. Tighten evenly to 15-20 lbs•in (1.69

- 2.26 Nm) torque. If you are using the optional

plastic break-away screws, tighten evenly to 5

lbs•in (.56 Nm) torque. The break-away ring must

lie flat against the face of the rear manifold.

Special Note: When replacing the tubing in the

atomizer extension, make sure to slide tubing

(76998-04 - Item 53) over the paint line (A10841-

03 - Item 43) before installing nuts and ferrules

onto fittings and tightening. This tubing is required

as an extra dielectric shield when the high voltage

cable is installed.

RMA-303 Indirect Charge - Maintenance

Ransburg

60

LN-9252-06.4

Advertising