Vanguard VCBA ver.10.xx User Manual
Page 62
REV 2 VCBA VERSION 10.xx SOFTWARE MANUAL
60
5.3 Modifying
an
Existing
Circuit Breaker Test Plan
To modify an existing test plan:
1. Close any open test records or test plans.
2. Click on the Test-Plan menu and select Modify Test Plan… The following window will be
displayed:
3. The timing plans in the current directory will be listed. You may click on the “Path”
button at the top of the window to browse to another location on your computer. Once
you have located the test plan file, click on the file name, and then click on the “OK”
button. The test plan file will be loaded.
4. You will then be presented with the same sequence of parameter windows as in section
5.2. Each window will display the corresponding data from the loaded timing plan. Make
any necessary changes per the instructions in section 5.2. You may also click on the
“Cancel” button and just view the tabulated test plan information.
5. After you have made the changes to the timing plan (or if you clicked on the “Cancel”
button during the process), you will be asked if you would like to save the test plan: