Configuration – GW Instek PEL-3000 Series User Manual User Manual
Page 157

EXTERNAL CONTROL
155
Configuration
Description
When using the multiple units in parallel all the
basic settings are adopted from the master unit.
Operation
1. Make sure all load units are turned off.
2. Make sure the DUT is turned off.
3. Connect the load units to the DUT.
Ensure the wire gauge is sufficient to handle the
increase in current
4. Connect the Master unit to the slave units via
the J1/J2 connectors*.
Use the GTL-255 frame link cables
Connect from:
Master J2 Slave1 J1
Slave1 J2 Slave2 J1 and so on.
Remove one ferrite core from the last frame link
cable. Remove the ferrite core that is closest to
the J1 port on the last slave unit. See the
diagram below for details.
5. Turn the load units on.
6. On the designated master unit, press
Main
>
Configure [F5] > Next Menu [F4] > Parallel[F1].
7. Set the unit to Master with the Operation
setting.
8. Assign the number of attached slave units or
booster units with the Parallel and Booster
settings.