Booster off, Parallel operation 3 master, Configure – GW Instek PEL-3000 Series User Manual User Manual
Page 158: Parallel operation 3 slave
Advertising

PEL-3000 User Manual
156
A maximum of 5 units can be used in parallel.
A maximum of 4 boosters can be used with a
single PEL-3111, acting as a master unit.
External
Previous
Menu
Booster
OFF
LOAD
RS232
03/Sep/2012
Parallel
Operation
3
Master
Configure
A Value
CV
35A
15V
Fast
Knob
Parallel
9. On the slave units, press
Main
> Configure
[F5] > Next Menu [F4] > Parallel[F1] > and set
Operation to Slave.
When in Slave mode, all keys are locked, except
for the Scroll wheel and Enter key.
External
Previous
Menu
Booster
OFF
LOAD
RS232
03/Sep/2012
Parallel
Operation
3
Slave
Configure
A Value
CV
35A
15V
Fast
Knob
Parallel
Caution
*Failing to remove the last ferrite core from the
GTL-255 cable may reduce the stability of the units
when used in parallel.
Advertising