2 installing the r520/r520n/r520x, Installation – INOR IPAQ R520X User Manual

Page 12

Advertising
background image

3

INSTALLATION

C520/C520X / R520/R520X

09/2010 • 86B5200001

www.inor.com

12

3.2 Installing the R520/R520N/R520X

The R520 / R520X transmitter is intended for installation on a top-hat rail according to

DIN EN 50022.

Figure 4: Rail installation

1

Fix the upper part of the transmitter onto the rail.

2

Press the lower part of the transmitter against the rail.

3

To remove the transmitter, use a screwdriver to bend the locking device using a small screwdriver.

Carefully pull the transmitter in the forward direction.


ATTENTION!
The R520 transmitter may not be installed in potentially explosive areas other than Zone 2 and

Division 2. For Zone 2/Div 2 applications a Class 2 power supply placed in safe area is needed.
In other potentially explosive areas, the R520X must be used.
The transmitter R520X can be installed in potentially hazardous area Zone 1 and 2 and the input

may be connected to Zone 0. R520X must be supplied by an intrinsically safe power supply unit

or Zener barrier placed outside of the potentially explosive zone.

Advertising
This manual is related to the following products: