KROHNE BM 102 Handbook User Manual
Page 11
Advertising
BM
102
11
Stilling wells
Tanks with floating roofs for petro-chemical applications: use a stilling well.
1 Stilling
well
2 Tank
3 Floating
roof
4
Product (petroleum applications)
5
Well fixed to tank base (no roof
deformation)
6 Sediment
1.3.3 Installation
instructions: Gauge - all applications
BM102 gauges are designed to be mounted on a suitable process connection on a tank or sump.
Install the gauge using two people to avoid damaging the probe. Support the housing and the
probe.
Installation of single and twin cable probe level meters
1
Caution :
Do not over-bend
probe!
2
Inserting the probe:
hold more than one
metre above the
opening to avoid
cable bending.