KROHNE BM 102 Handbook User Manual
Page 24
Advertising
24
BM 102
Installing and connecting PCSTAR 2 to the gauge
1. Connect the HART® adapter (not included in supply) through a load impedance of 350 ohms
maximum (for hazardous-duty purposes, fix to the non-intrinsically safe side of the repeater
power supply unit) and plug it into a serial interface on your PC. The repeater power supply
unit must have HART® capability.
2. Installing the program: Access the files on the floppy disk supplied with the instrument and
execute the file "setup.exe" and follow the instructions on the screen.
3. Running the program: once the program is installed, execute the program. The screen shown
below will be displayed.
Advertising