KROHNE BM 102 Handbook User Manual

Page 24

Advertising
background image

24

BM 102


Installing and connecting PCSTAR 2 to the gauge

1. Connect the HART® adapter (not included in supply) through a load impedance of 350 ohms

maximum (for hazardous-duty purposes, fix to the non-intrinsically safe side of the repeater
power supply unit) and plug it into a serial interface on your PC. The repeater power supply
unit must have HART® capability.


2. Installing the program: Access the files on the floppy disk supplied with the instrument and

execute the file "setup.exe" and follow the instructions on the screen.


3. Running the program: once the program is installed, execute the program. The screen shown

below will be displayed.

Advertising