NORD Drivesystems BU0550 User Manual

Page 47

Advertising
background image

3 AWL (Instruction List, IL)

BU 0550 GB-0813

47

3.5.1.7

TON switch-on delay

If IN = TRUE is set, the timer counts upwards. If ET = PT, Q is set to TRUE and the timer stops. Q remains
TRUE as long as IN is also TRUE. With a new rising flank on IN, the timer restarts at zero. PT can be
changed while the timer is running.

The time in PT is stated in milliseconds. This enables a time delay between 5ms and 24.8 days. As the time
base of the PLC is 5ms, the minimum time delay is also 5ms.

Here, literals can be used for simplified input, e.g.

LD TIME#50s20ms

= 50.020 seconds

LD TIME#1d30m

= 1 day and 30 minutes

IN

Q

PT

CV

Table 65 TON switch-on delay

NOTE

The time ET runs independently from the PLC cycle. Starting of the timer with IN and setting of
the output Q is only executed with the function call-up "CAL". The function call-up takes place
within a PLC cycle. However, with PLC programs which are longer than 5 ms this may result in
the occurrence of jitter.

VAR_INPUT

VAR_OUTPUT

Input

Explanation

Type

Output

Explanation

Type

IN

Timer active

BOOL

Q

TRUE

( IN=TRUE & ET=PT )

BOOL

PT

Duration

DINT

ET

Current timer reading

DINT

Advertising