System rack installation, Rack-mount kit contents – Acer Altos G901 User Manual

Page 161

Advertising
background image

145

System rack installation

The Altos G900 server system is available in both rack-mount and tower
configuration. A rack mount kit is available for customers who want to
convert a tower-mounted system to rack-model design. To purchase a
rack mount kit, contact your local Acer representative or order directly
from www.acer.com.tw.

The figure below shows the Altos G900 server in a rack-mount and
tower position.

Important: When installing or removing the server from the
rack, use an appropriate mechanical assist unit to lift and move
the server.

Rack-mount kit contents

The rack conversion kit for the Altos G900 server platform contains the
following items:

Rack bezel and keys

Rack handle kit (handles and screws)

Rack-mount position

Tower position

Figure 56 - Server orientation

BB!H:11!vh!.!FO/cppl!!Qbhf!256!!Gsjebz-!Kbovbsz!28-!3114!!8;24!QN

Advertising