Tools and supplies needed, Equipment rack precautions, Warnings – Acer Altos G901 User Manual

Page 162

Advertising
background image

Appendix A: System rack installation

146

Bag of mounting hardware (bushings and screws)

You must also purchase the rack-mount rail kit for the Altos G900
server platform to complete the conversion from tower to a rack-
mount configuration.

a

Rack bezel and keys (2)

b

Rack handle kit - includes handles (2) and screws (4)

c

Bag of mounting hardware - includes bushings (8) and screws
(8)

Tools and supplies needed

You will need the following tools and supplies to install the contents of
this kit:

Phillips (cross-head) screwdriver (#2 bit)

Antistatic wrist strap (recommended)

Note: The Altos G900 chassis is designed to be compatible with
the EIA-310-d rack standard. Be sure to select a rack cabinet
enclosure that is EIA-310-d compliant.

Equipment rack precautions

Warnings

ANCHOR THE EQUIPMENT RACK: The equipment rack must be
anchored to an unmovable support to prevent it from falling over
when one or more servers are extended in front of it on slide

Figure 57 - Rack-mount kit components

BB!H:11!vh!.!FO/cppl!!Qbhf!257!!Gsjebz-!Kbovbsz!28-!3114!!8;24!QN

Advertising