Three month inspection, Seven year inspection, Replacement criteria – JLG 1100S Service Manual User Manual

Page 201

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121256

– JLG Lift –

4-53

6. Inspect sheaves with a groove wearout gauge for

excessive wear.

7. Ropes passing inspection should be lubricated with

wire rope lubricant before reassembly.

Three Month Inspection

1. Remove boom covers and visually (with flashlight)

inspect the ropes for rust, broken wires, frays,
abuse, or any signs of abnormalities.

2. Check rope tension by deflecting the ropes by

hand...properly tensioned ropes should have little or
no movement.

Seven Year Inspection

1. Mandatory wire rope and sheave replacement.

Additional inspection required if:

a. Machine is exposed to hostile environment or

conditions.

b. Erratic boom operation or unusual noise exists.
c. Machine is idle for an extended period.
d. Boom is overloaded or sustained a shock load.
e. Boom exposed to electrical arc...wires may be

fused internally.

Replacement Criteria

1. Sheaves and wire rope must be replaced as sets.

2. Rusted or corroded wire ropes.

3. Kinked, “bird caged”, or crushed ropes.

4. Ropes at end of adjustment range.

5. Sheaves failing wearout gage inspection.

6. Ropes with 6 total broken wires in one rope lay, 3 in

one strand in one rope lay, 1 valley break, or 1 break
at any end termination.

Observe the groove so that it may be clearly seen

whether the contour of the gauge matches the

contour of the bottom of the groove.

Advertising
This manual is related to the following products: