Assembly, Assembly -45 – JLG 1100S Service Manual User Manual

Page 267

Advertising
background image

SECTION 5 - HYDRAULICS

3121256

– JLG Lift –

5-45

22. The external front bearing ring is pulled out of the

pump housing.

23. Remove the o-ring. Lifting of the valve plate isn’t

shown.

24. A bearing puller is used to disassemble the external

bearing ring of the taper roller bearing inside the
port plate. Take care of the surface of the port plate.

25. The spring has additional pretension while you dis-

assemble the three pressure pins inside the cylinder.

Assembly

1. Measurement of the taper roller bearing pretention.

2. Ensure there is a correct connection of the piston

rod and the swash plate.

Advertising
This manual is related to the following products: