Test from the ground station, Test from the ground station -30 – JLG 1100S Service Manual User Manual

Page 304

Advertising
background image

SECTION 6 - JLG CONTROL SYSTEM

6-30

– JLG Lift –

3121256

Test from the Ground Station

1. Position the Platform/Ground select switch to the

Ground position.

2. Plug the analyzer into the connector inside the

Ground control box.

3. Pull out the Emergency Stop switch. and Start the

engine.

4. The analyzer screen should read:

5. Use the arrow button to reach SYSTEM TEST. Hit

Enter. The analyzer will prompt you asking if you
want to activate the system test; hit Enter again to
activate.

6. Follow the flow path in Figure 6-13., System Test

Flow Chart - Ground Station Tests and go through
the component tests. Hit the ESC key during any
part of the test to return to the main menu without
completing all tests or wait until all tests are com-
plete. During the TEST ALL INPUTS sequence, the
analyzer allows control switches to be operated and
shows if they are closed (CL) or open (OP).

Advertising
This manual is related to the following products: