15 calibrating platform level, Step 1: setting the platform valve minimums, Calibrating platform level -54 – JLG 1100S Service Manual User Manual

Page 328: Step 1: setting the platform valve minimums -54

Advertising
background image

SECTION 6 - JLG CONTROL SYSTEM

6-54

– JLG Lift –

3121256

10. Hit ENTER again. “Cal. Complete” message should

appear

11. Engine should again return to idle.

12. Hit ESC should return to “Basket U Crkpt” screen.

13. Hit RIGHT ARROWto get to the “Basket D Crkpt”

screen. Hit ENTER.

14. “Calibrate?” prompt should appear. Hit ENTER

again.

15. You will hear engine go to 1800 rpm.

Using UP ARROW, increase the value until you see the
basket down movement.

Hit ENTER again. “Cal. Complete” message should
appear

Engine should again return to idle.

Hit ESC to exit.

Cycle power to the machine.

6.15 CALIBRATING PLATFORM LEVEL

STEP 1: SETTING THE PLATFORM VALVE
MINIMUMS

1. Position the Platform/Ground select switch to the

Ground position.

2. Plug the analyzer into the connector inside the

Ground control box.

3. Pull out the Emergency Stop switch and start the

engine.

4. The analyzer screen should read:

5. Use the arrow button to reach ACCESS LEVEL 2. Hit

Enter.

6. Enter the Access Code, 33271.

Advertising
This manual is related to the following products: