Installation, Installation -38 – JLG 1100S Service Manual User Manual

Page 80

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3-38

– JLG Lift –

3121256

18. Fit the O-Ring 2-177 suitably greased, mount the

cover locking it with the BR250 ring.

19. Fit the O-Ring 2-163 suitably greased, onto the

motor coupling flange S-D LC/KC. Mount the flange
on the spindle with 6 M8x25 socket cap screws at
the torque of 2.4daNm with LOCTITE 243 Insert the
pin and carry out the rotation test according to PGQ-
22 standard.

20. Mount the release cover fastening it with 2 M6x20

hexagonal screws at the torque of 1daNm. Mount
the 1/4"GAS plugs on the cover at the torque of
1daNm.

Installation

NOTE: The drive hub including drive motor weighs approxi-

mately 307 lbs. (139 kg). The non-drive hub weighs
approximately 140 lbs. (63.5 kg).

1. Use an adequate lifting device to support the weight

of the hub.

2. Align the hub assembly with the mounting holes in

the spindle. Apply Loctite #271 to the bolts, and
secure the hub to the spindle with the bolts and
washers.

3. Install the tire and wheel assembly. Refer to Section

3.1, Tires & Wheels.

Advertising
This manual is related to the following products: