Motor control valve assembly, Motor control valve assembly -51, Swing drive - motor control valve assembly -51 – JLG 1100S Service Manual User Manual

Page 93

Advertising
background image

SECTION 3 - CHASSIS & TURNTABLE

3121256

– JLG Lift –

3-51

Motor Control Valve Assembly

1. Lay assembly down with motor ports facing up.

Remove the two plastic plugs in the motor ports,
being careful not to loose the O-ring in each port.
Assemble the Motor control Valve (32) onto the
Motor (10) with Bolt (34) and Lock Washers (33).
Torque Bolts (33) 23 to 27 ft-lbs. (32 to 38 Nm).

NOTE: Be sure to align the holes in the control valve with

the motor ports.

2. Install Elbow Fittings (36) into Brake (26) and torque

13 to 15 ft-lbs. (18 to 21 Nm).

3. Install Elbow Fittings (36) into Motor Control Valve

(32) and torque to 13 to 15 ft-lbs. (18 to 21 Nm).

4. Assemble Tube (35) into Elbow Fittings (36) and

torque 13 to 15 ft-lbs. (18 to 21 Nm).

5. Install O-ring Plugs (21) into Motor Control Valve

(32) and torque 30 to 31 ft-lbs. (42 to 43 Nm).

6. Pressure test brake, tube and control valve connec-

tions by applying 3000 psi (207 bar) pressure to the
brake bleed port and holding for 1 minute. Check for
leaks at the control-valve-motor interface and the
tube connections. Release pressure.

7. Place I.D. Plate (24) onto Housing (1G) with two

Drive Screws (25). I.D. Plate (24) is to be inline with
O-ring Plug (1J) as shown on assembly print.

1J. O-Ring Plug
10. Hydraulic Motor
21. Plug
24. ID Plate

25. Drive Screw
26. Hydraulic Brake
32. Motor Control Valve
33. Lockwasher

34. Hex Bolt
35. Hydraulic Tubing
36. Elbow

Figure 3-42. Swing Drive - Motor Control Valve Assembly

Advertising
This manual is related to the following products: