JLG X500AJ Operator Manual User Manual
Page 119
SECTION 6 - GENERAL SPECIFICATIONS AND OPERATOR MAINTENANCE
3121636
– JLG Lift –
6-9
Figure 6-3. Component Maintenance Intervals - X500AJ - Lithium-Ion Machine
PART
MAINTENANCE
WORK
BEFORE
STARTING
AS NEEDED
INTERVAL (HOURS)
10
50
100 250
500 1000
HYDRAULIC OIL
CHECK LEVEL
•
CHANGE
•
HYDRAULIC OIL
FILTER
REPLACE
CARTRIDGE
•
*
•
ARTICULATE
JOINT POINTS
GREASING
•
*
•
REDUCTION GEAR
OIL
CHECK LEVEL
•
CHANGE
•
*
•
MACHINE
GENERAL PERIODICAL
CHECKS
•
•
*
EXTENSION ARM
INTERNAL SLIDING
RING
CHECK WEAR
•
REPLACE
•
TURNTABLE BOLT
TIGHTENING
CHECK
•
*
•
LITHIUM-ION
MACHINE
* First time service interval
then per chart thereafter.
** Every 3 months or
1000 hrs of operation.
*** Every 5 years or
2000 hrs of operation.
#
Check every year.
If the torque is not
correct replace the nuts
with two new nuts of
the same specification.
Install dry without
using oil or grease to
specified torque.