SECTION 2 - USER RESPONSIBILITIES, MACHINE PREPARATION AND INSPECTION

2-2

– JLG Lift –

3121221

Training Supervision

Training must be done under the supervision of a qualified per-
son in an open area free of obstructions until the trainee has
developed the ability to safely control and operate the machine.

Operator Responsibility

The operator must be instructed that he/she has the responsi-
bility and authority to shut down the machine in case of a mal-
function or other unsafe condition of either the machine or the
job site.

2.2

PREPARATION, INSPECTION, AND MAINTENANCE

Table 2-1 covers the periodic machine inspections and mainte-
nance recommended by JLG Industries, Inc. Consult local regu-
lations for further requirements for aerial work platforms. The
frequency of inspections and maintenance must be increased
as necessary when the machine is used in a harsh or hostile
environment, if the machine is used with increased frequency,
or if the machine is used in a severe manner.

Advertising