4.2 ROTATOR AND SLAVE CYLINDER

Removal

1. Tag and disconnect hydraulic lines to rotator. Use

suitable container to retain any residual hydraulic
fluid. Cap hydraulic lines and ports.

2. Remove hardware from pin #1. Using a suitable

brass drift and hammer remove pin #1 from the fly
boom.

3. Supporting the rotator, remove the hardware from

pin #2. Using a suitable brass drift and hammer,
remove pin #2 from the fly boom and remove the
rotator.

4. Telescope the fly section out approximately 20

inches (50.8 cm) to gain access to the slave leveling
cylinder.

A,B,D

C,D

E

A
B
C
D
E

Torque to 50 ft.lbs. (68 Nm)
Loctite #242
Torque to 480 ft. lbs. (650 Nm)
Check torque every 150 hours of operation
Torque to 85 ft. lbs. (115 Nm)

Figure 4-2. Platform Support Torque Values

NOTE: If any rotator bolts are replaced, all bolts

on the rotator should be retorqued.

Figure 4-3. Reassembly of Components-Rotator and

Leveling Cylinder