JLG 740AJ Service Manual User Manual

Page 266

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-50

– JLG Lift –

3121160

After the required activation time has passed,
release the function switch and press "ENTER"

. The analyzer will display the following

message:

If the calibration has been completed success-
fully, the screen will automatically change to:

If the calibration has not been completed suc-
cessfully, the display will automatically change
to:

Repeat step i until the calibration time require-
ment has been satisfied.

DO NOT RAISE THE TOWER BOOM AGAIN DURING CALIBRA-
TION.

j. To correctly complete the calibration process,

fully retract and fully lower the boom. Once the
machine is in the stowed position, turn off the
machine and disconnect the analyzer.

Advertising