JLG 740AJ Service Manual User Manual

Page 223

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121160

– JLG Lift –

4-7

4. To install new links, extend the upper moving end

over the lower part of the track so the new connec-
tion point is in the curved part of the track. This will
allow the round half-shears to be rotated in a way
they will fit into the peanut-shaped cut-outs.

5. Install the pin into the center hole, then slide the

washer over the pin. Install the snap ring into the
groove in the pin.

Advertising