Calibration - pre ade machines, Calibration - pre ade machines -47 – JLG 740AJ Service Manual User Manual

Page 263

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121160

– JLG Lift –

4-47

Calibration - Pre ADE Machines

CALIB RATION OF THE UPRIGH T MONITORING SYSTEM
REQUIRES THE MACHINE TO BE ON A FIRM AND LEVEL SURFACE
WITH SUFFICIENT OVERHEAD CLEARANCE TO FULLY ELEVATE
THE TOWER BOOM.

1. Refer to Section 6 for operating instructions and

menu structures for the hand-held analyzer,
#2901443.

2. Connect the hand-held analyzer at the ground con-

trol station using the four-pin analyzer connector
shown below.

3. Pull out the emergency stop button at the ground

control station and start the engine from the ground
controls.

NOTE: The boom malfunction indicator light at the ground

controls will flash until the initial calibration is per-
formed.

4. To calibrate the Upright Monitoring System through

the hand-held analyzer, you must be in access level
1. To advance to access level 1, scroll to the

ACCESS LEVEL menu and press "ENTER"

.

Using the arrows on the keypad, enter the password

"33271" and press "ENTER"

.

NOTE: Repeat step #4 if the correct access level is not dis-

played.

5. Calibrate the Upright Monitoring System (UMS) sen-

sors by the following procedure:

THE UPRIGHT SENSOR AND TURNTABLE SENSOR WILL BE CALI-
BRATED SIMULTANEOUSLY THROUGH THIS STEP.

a. In access level 1, scroll through the menu items

until "CALIBRATIONS" is displayed on the sec-
ond line of the analyzer screen as shown below.

b. When "CALIBRATIONS" is displayed, press

"ENTER"

to advance to the next screen.

The screen will display the following:

Advertising