SECTION 5 - HYDRAULICS

5-10

– JLG Lift –

3121160

5.6 CYLINDER REMOVAL AND

INSTALLATION

Main Boom Telescope Cylinder Removal

1. Place machine on a flat and level surface, with main

boom in the horizontal position. Extend telescope
up to gain access to main fly boom telescope cylin-
der, rod end pin #1.

2. Shut down engine. Support main boom platform

end with a crane of adequate capacity.

HYDRAULIC LINES AND PORTS SHOULD BE CAPPED IMMEDIATELY
AFTER DISCONNECTING LINES TO AVOID THE ENTRY OF CONTAMI-
NANTS INTO THE SYSTEM

3. Tag and disconnect hydraulic lines to telescope cyl-

inder. Use suitable container to retain any residual
hydraulic fluid. Cap hydraulic lines and ports.

4. Remove the retaining rings that retain the telescope

cylinder rod to the fly boom.

5. Using a suitable brass drift, carefully drive telescope

cylinder rod pin from the fly boom.

Table 5-2. Holding Valve Torque Specifications

HOLDING VALVE TORQUE SPECIFICATIONS

Description

Torque Value

SUN - 7/8 hEX m20 X 1.5 this.

30-35 ft. lbs.
(41 - 48 Nm)

SUN - 1 1/8 HEX 1 - 14 UNS THDS.

45 - 50 ft. lbs.
(61 - 68 Nm)

SUN - 1 1/4 HEX m36 X 2 THDS.

150 - 160 ft. lbs.
(204 - 217 Nm)

RACINE - 1 1/8 HEX 1 1/16- 12 THDS.

50 - 55 ft. lbs.
(68 - 75 Nm)

RACINE - 1 3/8 HEX 1 3/16- 12 THDS.

75 -80 ft. lbs.
(102 -109 Nm)

RACINE - 1 7/8 HEX 1 5/8- 12 THDS.

100-110 ft. lbs.
(136 - 149 Nm)

Figure 5-13. Components Main Boom and Tower Boom