10 platform, Platform sections replacement, 11 wear pads – JLG 740AJ Service Manual User Manual

Page 240: Tower boom, Platform -24, Platform sections replacement -24, Wear pads -24, Tower boom -24, Platform section replacement -24, Location and thickness of wear pads -24

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-24

– JLG Lift –

3121160

4.10 PLATFORM

Platform Sections Replacement

The platform is made up of five sections: floor, right side,
left side, back (console box mounting.) and gate. The sec-
tions are secured with huck magna grip fastener and col-
lars. Replace damaged platform sections as follows:

1. Support the huck collar with a sledge hammer or

other suitable support.

2. Using a hammer and chisel, remove the collar from

the fastener as shown in the diagram below.

3. When installing new section of platform replace fas-

teners with 1/4 x 20 NC x 2 1/4" grade 5 bolts, flat-
washers and locknuts.

4. When installing a new gate to platform, replace riv-

ets with 1/4 x 20 NC x 2 “grade 5 bolts, flatwashers
and locknuts.

4.11 WEAR PADS

Tower Boom

1. Shim up wear pads until 1/32 inch clearance to adja-

cent surface.

2. Replace wear pads when worn to within 1/16 inch

(1.59 mm) of threaded insert.

NOTE: Wear pads are made of polyethylene; these pads are

intended to slide on polyurethane painted surfaces.

3. When adjusting wear pads, removing or adding

shims, bolt length must also be changed.

a. When adding shims, longer bolts must be used

to ensure proper thread engagement in insert.

b. When shims are removed, shorter bolts must be

used so bolt does not protrude from insert and
come into contact with boom surface.

Figure 4-11. Platform Section Replacement

Figure 4-12. Location And Thickness Of Wear Pads

WEAR PADS

PAD

NUMBER

THICKNESS

OF NEW PAD

REPLACE WHEN

WORN TO

A

5/8

9/16

B

3/4

5/8

Advertising