Inspection, Inspection -26 – JLG 740AJ Service Manual User Manual

Page 242

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-26

– JLG Lift –

3121160

4. Using a torch, apply heat to the setscrews on the

bottom of actuator.

5. Remove the two (2) setscrews (4) from bottom of the

actuator (1). Discard setscrew.

6. Place two (2) 3/8"x16 NC bolts in threaded holes in

bottom of the actuator. Using a suitable bar, unscrew
the end cap (5). Remove the end cap from actuator
(1).

7. Remove the shaft (2) from piston sleeve (3) and the

actuator housing (1).

8. Remove piston sleeve (3) from housing (1).

9. Remove all seals and bearings from grooves. Dis-

card seals.

Inspection

1. Clean all parts thoroughly.

2. Closely inspect all parts for excessive wear, cracks

and chips. Replace parts as necessary.

NOTE: A small amount of wear in the spline teeth will have

little effect on the actuator strength. New spline sets
are manufactured with a backlash of about 0.005 in.
per mating set. After long service, a backlash of
about 0.015 per set may still be acceptable in most
cases, depending on the required accuracy of the
application.

3. Check the ring gear for wear and weld damage to

the pins.

4. Inspect the cylinder bore for wear and scratches.

Heating Setscrews

Removing Setscrew

Removing End Cap

Removing Shaft from Housing

Removing Sleeve From Housing

Advertising