Main boom, 12 rotator - helac (prior to s/n 0300130881), Disassembly – JLG 740AJ Service Manual User Manual

Page 241: Main boom -25, Rotator - helac (prior to s/n 0300130881) -25, Disassembly -25

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121160

– JLG Lift –

4-25

Main Boom

1. Shim up wear pads to within 1/32 inch (.79 mm)

clearance between wear pad and adjacent surface.

2. Replace wear pads when worn within 1/16 inch (1.59

mm) and 1/8 inch (3.18 mm) - B, C, D of threaded
insert. See Location and Thickness Of Wear Pads.

3. Adjusting wear pads, removing or adding shims,

bolt length must also be changed.

a. When adding shims, longer bolts must be used

to ensure proper thread engagement in insert.

b. When shims are removed, shorter bolts must be

used so bolt does not protrude from insert and
Sheaves and wire rope must be replaced as
sets.

4.12 ROTATOR - HELAC (PRIOR TO S/N

0300130881)

Disassembly

1. Place actuator on a clean workbench.

2. Remove all hydraulic fittings.

3. Using a suitable hammer and chisel remove the por-

tion of end cap securing setscrew.

Removing Portion Of End Cap

Advertising