25 kpm ii monitor operation, Kpm ii, Rev. 6/11 – Kinze 3000 Rigid Frame Planter Rev. 6/14 User Manual

Page 95: Red led blue connector

Advertising
background image

TM

Model 3000

M0188-01

Rev. 6/11

6-25

KPM II Monitor Operation

STEP 7 Determine which row you want as number

one and plug seed tube w/sensor into
harness.

Continue plugging in sensors along with
shaft rotation sensors if so equipped. Row
1 first, row 2 second and so on up to 18
rows. When a sensor is plugged in, the
corresponding row number on the upper
LCD display will stay solid, the monitor will
chirp twice and a red LED (Light Emitting
Diode) on the seed tube sensor will turn
on for approximately 30 seconds to show
connection is made.

STEP 6 (Continued)

NOTE: SMM console may not be applicable to
all models.

ON

AREA

OFF

ExIT

ENTER

OK

CLEAR

SETUP

ROw

SPACING

TOTAL

AREA

UNITS

SPEED

VOLUME

SCAN

SEED

POPULATION
SEED

SPACING

FIELD

AREA

SPACING

TOTAL

SEED

POP.

FIELD

SELECT

SPEED

SCAN

SETUP

REAR

12

11

10

9

8

7

6

5

4

3

2

1

(1314 15 1617 18)

(FRONT)

FLASHING

SETUP

REAR

®

KPM II

12060211

®

SMM

(METR55b)

Red LED

Blue Connector

Advertising