25 kpm ii monitor operation, Kpm ii, Rev. 6/11 – Kinze 3000 Rigid Frame Planter Rev. 6/14 User Manual
Page 95: Red led blue connector
TM
Model 3000
M0188-01
Rev. 6/11
6-25
KPM II Monitor Operation
STEP 7 Determine which row you want as number
one and plug seed tube w/sensor into
harness.
Continue plugging in sensors along with
shaft rotation sensors if so equipped. Row
1 first, row 2 second and so on up to 18
rows. When a sensor is plugged in, the
corresponding row number on the upper
LCD display will stay solid, the monitor will
chirp twice and a red LED (Light Emitting
Diode) on the seed tube sensor will turn
on for approximately 30 seconds to show
connection is made.
STEP 6 (Continued)
NOTE: SMM console may not be applicable to
all models.
ON
AREA
OFF
ExIT
ENTER
OK
CLEAR
SETUP
ROw
SPACING
TOTAL
AREA
UNITS
SPEED
VOLUME
SCAN
SEED
POPULATION
SEED
SPACING
FIELD
AREA
SPACING
TOTAL
SEED
POP.
FIELD
SELECT
SPEED
SCAN
SETUP
REAR
12
11
10
9
8
7
6
5
4
3
2
1
(1314 15 1617 18)
(FRONT)
FLASHING
SETUP
REAR
®
KPM II
•
12060211
®
SMM
(METR55b)
Red LED
Blue Connector