Previous billing period data – SATEC EM720 Operation Manual User Manual

Page 38

Advertising
background image

Chapter 3 Using Front Display

Data Displays

38

EM720 Power Quality and Revenue Meter

Total cumulative maximum demand reading of

register 4 – exported kvar.

Tariff 1 cumulative maximum demand reading of
register 1 – imported kW.

Tariff 3 cumulative maximum demand reading of
register 4 – exported kvar.

Previous Billing Period Data

The following example demonstrates billing displays for the
three previous billing periods. Displays for the last billing
period (BILL 1) and for two preceding billing periods (BILL 2)
and (BILL 3) look the same.

Previous billing period data - general page: period
start date and time, period end date and time, and

period duration in days.

Total energy reading of register 1 – imported kWh.

Total energy reading of register 2 – exported kWh.

Tariff 1 energy reading of register 1 – imported

kWh.

Tariff 2 energy reading of register 1 – imported

kWh.

Total maximum demand reading of register 1 –
imported kW.