SATEC EM720 Operation Manual User Manual

Page 75

Advertising
background image

Chapter 5 Configuring the EM720

General Meter Setup

EM720 Power Quality and Revenue Meter

75

Parameter Options

Description

Billing Point Location

Supply side, far end,
Supply side,
transformer end,
Load side,
transformer end,
Load side, far end

Defines the location of the billing point:
far end – near the supply source or near the load,
transformer end – near the power transformer.

Number of Metering Elements 2 (Open Delta)

3 (WYE)

Defines the number of metering elements in the
meter depending on the wiring mode. Select 2 for

3OP2/3OP2, and 3 for 4LN3/4LL3 wiring modes.

Power Transformer Data

Primary Rated Voltage, V

Primary rated voltage of the power transformer

Secondary Rated Voltage, V

Secondary rated voltage of the power transformer

Rated Power, kVA

Rated transformer power

No-load Iron Watt Loss

Watt losses at rated voltage due to iron

Full-load Copper Watt Loss

Watt losses at rated voltage due to copper

Percent Excitation Current

Transformer percent exciting current

Percent Impedance

Transformer percent impedance

Supply-side Power Line Data

Length, miles

Power line length, in miles or km

Resistance, Ohm/mile

Power line resistance, in Ohm/mile or Ohm/km

Reactance, Ohm/mile

Power line inductance, in Ohm/mile or Ohm/km

Load-side Power Line Data

Length, miles

Power line length, in miles or km

Resistance, Ohm/mile

Power line resistance, in Ohm/mile or Ohm/km

Reactance, Ohm/mile

Power line inductance, in Ohm/mile or Ohm/km

%Loss Constants

Iron Watt Losses, %LWFe

Percent watt losses due to iron

Copper Watt Losses, %LWCu

Percent watt losses due to copper

Iron VAR Losses, %LVFe

Percent var losses due to iron

Copper VAR Losses, %LVCu

Percent var losses due to copper

The EM720 uses pre-calculated loss constants for correcting
meter readings. All calculations are performed by Pas using
transformer and power line data, and then the resulting loss
constants are downloaded to the meter. If power line losses
are included in compensation, they are added to the loss
constants.

For more information on the loss calculation techniques, see
the Handbook for Electricity Metering, 10-th edition, by the
Edison Electric Institute.

To configure loss constants in the meter:

1. Specify the locations of the meter and a point of

billing. The losses will be added to, or subtracted from
the measured power depending on the locations of the
metering and billing points. Use the picture and table
below to check your settings.

Supply line

Load line

Power transformer

Far end

Far end

Transformer end

Transformer end

Metering point

Billing point

Advertising