Installation

1.12

2014

SITE 1

Step 2 cont.: Check and Prepare Opening.

Check to be sure the framing walls around the

opening are in the same plane. Do this by

performing a “string test” for plumb.

String Test for Plumb: Attach a string diagonally

across the opening from the outside, as shown. The

string(s) should gently touch in the center, if not the

opening is “out of plumb” by twice that distance

and needs to be corrected. Flip the string over itself

to check both planes. Fix any problems now.

*An “out of plumb” condition is one of the most

common reasons door units leak air and water.


Step 3: Caulk the Sub Floor.

On the sub floor at opening, place 3 very large beads

of sealant. Run beads full width of the opening.

Use Only Elastomeric or Polyurethane sealant.

Use an Entire Tube when Caulking along the Sub

Floor.

Step 3A: Installation with a Sill Pan.

Place the right and left sill pan ends onto the caulk beads and tightly against

the side of the opening.

Then, liberally coat the overlapped areas and the recessed areas of the pieces

with the PVC cement provided. Place center section(s) in position and hold

pieces together long enough to ensure a good bond.

For added protection, spread a bead of caulk along the glue joints and to help

prevent air infiltration, run a bead of caulk along the lower interior edge of the

sill pan. Additional caulking could affect the performance of the sill pan.

Do Not Caulk the bottom of the Sill when using a sill Pan.

Step 3B: Installation without a Sill Pan.

Lay the door unit on edge or face so

that the bottom surface of the sill

can be caulked. Place very large

beads of caulk across the full width

of the sill. Additionally, place beads

of caulk along the junction of the

sill and the jamb and on the bottom

surface of the jambs and

brickmould.

Note:

If a sill extender is used, place a large bead of caulk at the junction of

the extender and the sill approach.

Step 3 cont.: Caulking Back side of Brickmould.

Important!

Apply sealant to the back side of

brickmould around the entire

perimeter of the door unit. A 1/2 –

5/8 inch bead of Elastomeric or

Polyurethane caulk is essential.


Step 4: Place Unit in Opening and Temporarily Fasten.

Lift the unit up. With top edge

tilted away from opening,

center the unit and place sill

down onto sill pan or caulk

beads and tilt into opening. For

all door unit configurations,

note the hinge locations and

mark those locations on the

jamb faces near the door

surfaces.

Pre-drill 1/8 inch

diameter holes at these

locations and through the head

jamb adjacent to the mullions,

over the active sidelites.

A

counter sink bit will help to

conceal the screw heads.

Install screws in the center pre-

drilled hole locations on both jambs to temporarily secure the unit in the

place. Do not drive screws completely in at this time. Use #8 X 2-1/2 inch or 3

inch exterior grade screws.

Do Not Fasten through the Brickmould.

Step 5: Plumb and Fasten Side Head Mull Post .

Use a 6 foot level and plumb the

hinge side mullion both ways

(right to left and inside to

outside).

Place a screw through the pre-

drilled hole in the head jamb at

the hinge side mullion.

Do not drive the screw

completely in at this time.


Shim directly over hinge side mull

post. Using a 6 foot level, recheck

hinge mull post to ensure it is

plumb and straight. Finish driving

screw tight.

Note: When installing a French door with active sidelites, first set the hinge

mullion for the passive door. For details on properly setting the astragal slide

bolt hole locations, follow the instructions in the astragal site pack.